1. OBJECTIVE
This Method of Statement is meant to describe in
generality the Insulation Resistance Test process; which describes its general
setup and how the test is carried out.
2. SAFETY
All
personnel should continuously and consciously observe his work area for any
potentials danger and take adequate measures.
In
general:
a) All personnel should wear Personal Protective Equipments
suitable for the work and work area (e.g helmet, safety boots, goggles, glove,
etc)
b) If working in live station, ensure that isolation is done and
Permit To Work is issued. If possible, ensure no REMOTE operation is allowable
such as put the section into LOCAL.
c)
Do not touch the injection cable when the testing in
progress. If possible, make a distance around the test perimeter.
d) Ensure fully discharge the
apparatus once the test was done.
e)
Ensure that the working area is only at the permitted area
f)
Earth/ground test equipment
3. GENERAL INSULATION
RESISTANCE TEST
a.
General Setup
For
this Method of Statement, we use KYORITSU High Voltage Resistance Tester as our
test equipment.
Setup
the equipment as shown in Figure 1 as we are going to measure the insulation
resistance value of the circuit under test.
Ensure
firm contact of test equipment cables and objects under test.
b.
Test Process
Having
the setup prepared, the test itself is quite simply. Set the range switch to
desired insulation resistance range.
1. Phase to
Ground Insulation Resistance Test.
- Set the red lead to LINE and black lead to EARTH on the test
set. Connect the LINE lead to primary terminal and EARTH lead to ground point.
- Select range to 5kv then press the PRESS TO START button and
measure for 1 minute.
- The measurement value can be collected from the LCD monitor.
- Record down the result.
2.
Phase to Phase Insulation Resistance Test.
- Set the red lead to LINE and black lead to EARTH from the
test set. Connect the LINE lead to primary terminal and EARTH lead to secondary
point.
- Select range to 5kv then press the PRESS TO START button and
measure for 1 minute.
- The measurement value can be collected from the LCD monitor.